This is the mail archive of the
ecos-discuss@sources.redhat.com
mailing list for the eCos project.
Re: problem restarting after Cc-Cc on i386 target
- From: Nick Garnett <nickg at ecoscentric dot com>
- To: Philippe Moutarlier <philippe at alliantnetworks dot com>
- Cc: Ecos list <ecos-discuss at sources dot redhat dot com>
- Date: 27 May 2003 11:11:05 +0100
- Subject: Re: [ECOS] problem restarting after Cc-Cc on i386 target
- References: <1053720943.13688.86.camel@Dragon>
Philippe Moutarlier <philippe@alliantnetworks.com> writes:
> Each time I am stopping the execution under GDB using ctrl-c ctrl-c, the
> target stops responding and cannot continue. Re-issuing a break command
> leads to the following message :
>
> "Interrupted while waiting for the program"
>
> Is it a specific bug in my application that I should be suspicious about
> or a problem in my ecos configuration ?
>
This looks like the target is not responding to ^C at all. The message
comes from GDB and indicates that it has given up waiting for the
target to respond. The fact that you have to do two ^C's is
indiciative of this. The most likely explanation is that the
application had crashed with interrupts disabled.
--
Nick Garnett eCos Kernel Architect
http://www.ecoscentric.com/ The eCos and RedBoot experts
--
Before posting, please read the FAQ: http://sources.redhat.com/fom/ecos
and search the list archive: http://sources.redhat.com/ml/ecos-discuss